Lifting pre-made 3 bay roof sections with a 160T crane with a fly jib in an exposed location in the middle of winter was the easy bit !!!
Back propping down through every floor and punching up through the roof of a listed building wasn’t ????
This is the fourth different contract we have worked on at this Marina. This shows our designed truss out for the roof installation





